What will Chuck Hagel do about Iran’s plutonium production at Arak?

Iran's heavy water plant at Arak

Iran’s heavy water plant at Arak

Chuck Hagel was swept into office Tuesday, Feb. 26 by a Senate majority as Barack Obama’s new defense secretary atop a cloud of disinformation which aimed to confirm that Iran’s nuclear program has gone too far to stop – like Iran’s grip on Syria and Lebanon. This message was accentuated by what the London Telegraph called Iran’s Plan B, signified by “…a cloud of steam that indicates heavy-water production for… a nuclear reactor that can produce plutonium, which could then be used to make a bomb.”

DEBKAfile: The “cloud of steam” is no proof of an active plant; it could be just a trial run, but the timing of the British paper’s publication on the day of Hagel’s Senate endorsement and the Six-Power meeting with Iran in Kazkahstan to discuss its nuclear program, underscored the view of British Prime Minister David Cameron. He has said in private conversations that US President Obama, French President Francois Hollande and Israeli Prime Minister Binyamin Netanyahu are pursuing an unrealistic policy on Iran and should accept the reality that Iran has achieved a nuclear bomb capacity. Sanctions are therefore pointless and futile and should be lifted.

The point contributed by the Telegraph – for the benefit of the incoming US defense secretary – was that Iran has achieved a dual track to an atomic bomb, which only goes to strengthen Cameron’s argument.

More…

    
Plugin by: PHP Freelancer
This entry was posted in Editorial, Energy, War and tagged , , . Bookmark the permalink.